List of measurements
- Effect of control of each stage
 - Measurement when signal from top geophone does not go trought the slip-ring
 - Measurement from one stage to the other
 
Effect of control of each stage
| Ty on | data_001 | 
| Ty off | data_002 | 
One geophone is on the marble, the other at the sample location. The signal from the top geophone goes through the slip-ring
Measurement when signal from top geophone does not go trought the slip-ring
| Ty | Ry | Slip Ring | Spindle | Hexapod | Meas. file | 
|---|---|---|---|---|---|
| ON | ON | ON | ON | ON | meas_003.mat | 
| OFF | ON | ON | ON | ON | meas_004.mat | 
| OFF | OFF | ON | ON | ON | meas_005.mat | 
| OFF | OFF | OFF | ON | ON | meas_006.mat | 
| OFF | OFF | OFF | OFF | ON | meas_007.mat | 
| OFF | OFF | OFF | OFF | OFF | meas_008.mat | 
Meas009: everything off with signal goes through the slip-ring
Measurement from one stage to the other
From Marble to Ty
meas_010.mat
Everything off, one geophone on the marble, one geophone on the Ty (measure on Z direction)
=> Can be used to determine the vertical stiffness between the Granite and the Ty stage
Channels:
| 1 | Ground | 
| 2 | Ty | 
| 3 | Time | 
From Marble to Ry
meas_011.mat
Everything off, one geophone on the marble, one geophone on the Ry (measure on Z direction)
=> Can be used to determine the vertical stiffness of the Ry Stage (by taking into account the Ty stiffness)
Channels:
| 1 | Ground | 
| 2 | Ry | 
| 3 | Time | 
From Ty to Ry
meas_012.mat
Everything off, one geophone on the Ty, one geophone on the Ry (measure on Z direction)
=> Can be used to determine the vertical stiffness of the Ry stage
Channels:
| 1 | Ty | 
| 2 | Ry | 
| 3 | Time |