2019-03-14 16:36:39 +01:00
|
|
|
#+TITLE:Measurement of the ID31 Micro-Station
|
2019-05-10 09:36:37 +02:00
|
|
|
:DRAWER:
|
2019-03-14 16:36:39 +01:00
|
|
|
#+STARTUP: overview
|
|
|
|
|
2019-04-17 18:25:10 +02:00
|
|
|
#+HTML_HEAD: <link rel="stylesheet" type="text/css" href="./css/htmlize.css"/>
|
|
|
|
#+HTML_HEAD: <link rel="stylesheet" type="text/css" href="./css/readtheorg.css"/>
|
|
|
|
#+HTML_HEAD: <link rel="stylesheet" type="text/css" href="./css/zenburn.css"/>
|
|
|
|
#+HTML_HEAD: <script type="text/javascript" src="./js/jquery.min.js"></script>
|
|
|
|
#+HTML_HEAD: <script type="text/javascript" src="./js/bootstrap.min.js"></script>
|
|
|
|
#+HTML_HEAD: <script type="text/javascript" src="./js/jquery.stickytableheaders.min.js"></script>
|
|
|
|
#+HTML_HEAD: <script type="text/javascript" src="./js/readtheorg.js"></script>
|
2019-05-10 09:36:37 +02:00
|
|
|
:END:
|
|
|
|
|
|
|
|
This web-page gathers all the measurements done on the ID31 Micro Station.
|
2019-03-14 16:36:39 +01:00
|
|
|
|
2019-03-20 15:21:12 +01:00
|
|
|
* Measurements of the dynamics of the station
|
|
|
|
** Measurement 1
|
|
|
|
[[file:2017-11-17%20-%20Marc/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2017-11-17 |
|
|
|
|
| *Sensors* | Accelerometers |
|
|
|
|
| *Excitation* | Instrumented Hammer |
|
|
|
|
| *Location* | Laboratory |
|
|
|
|
|
|
|
|
Dynamics of the station is evaluated using instrumented hammer and accelerometers fixed on each stage.
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
- Obtain a first estimation of resonance frequencies
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
Resonances have been identified at 45Hz and 75Hz.
|
|
|
|
However, the quality of the measurements are bad at low frequency.
|
|
|
|
New measurements should be done with Geophones.
|
|
|
|
|
|
|
|
** Measurement 2
|
|
|
|
[[file:2018-01-12%20-%20Marc/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2018-01-12 |
|
|
|
|
| *Sensors* | Geophones |
|
|
|
|
| *Excitation* | Instrumented Hammer |
|
|
|
|
| *Location* | Laboratory |
|
|
|
|
| *Notes* | Unglued Granite |
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
Obtain better coherence at low frequency.
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
Resonances at 42Hz, 70Hz and 125Hz have been identified.
|
|
|
|
The coherence is much better than when using accelerometers.
|
|
|
|
|
|
|
|
** Measurement 3
|
|
|
|
[[file:2018-10-12%20-%20Marc/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2018-10-12 |
|
|
|
|
| *Sensors* | Geophones |
|
|
|
|
| *Excitation* | Instrumented Hammer |
|
|
|
|
| *Location* | Experimental Hutch |
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
The station is now installed on the experimental hutch with a glued granite (final location).
|
|
|
|
The station is identified again.
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
|
|
|
|
* Measurements of perturbations
|
|
|
|
** Noise coming from the control loop of each stage
|
|
|
|
[[file:2018-10-15%20-%20Marc/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2018-10-15 |
|
|
|
|
| *Sensors* | Geophones |
|
|
|
|
| *Location* | Experimental Hutch |
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
The objective is to estimate how much perturbation is injected in the system by the control systems of each stages of the micro station.
|
|
|
|
|
|
|
|
Geophones are located on the structure.
|
|
|
|
Each stage is turned on and off.
|
|
|
|
The signals of the geophones are then compared when the stage is on and off.
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
- The translation stage seems to have effect on the tilt stage at 20Hz.
|
|
|
|
- The Tilt stage and the Hexapod control systems have no effect on the motion of the other stages.
|
|
|
|
- The spindle stage control system seems to induce a motion of the Hexapod on the Z direction around 20Hz.
|
|
|
|
|
|
|
|
** Static guiding error estimation
|
|
|
|
[[file:Static/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2019-01-09 |
|
|
|
|
| *Sensors* | Interferometer |
|
|
|
|
| *Location* | Experimental Hutch |
|
|
|
|
|
|
|
|
Each stage is statically moved of all its stroke on after the other.
|
|
|
|
A metrology element is located at the sample position and its motion is measured in translations and rotations.
|
|
|
|
For each small displacement, the stage is stopped and the motion of the sample is recorded and averaged.
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
The goal is to estimate the guiding errors of each stage.
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
|
|
|
|
** Ground motion measurements
|
|
|
|
[[file:Ground%20Motion/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2014-10 |
|
|
|
|
| *Sensors* | Geophone |
|
|
|
|
| *Location* | ID31 Floor |
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
The objective is to obtain the Power Spectral Density of the ground motion at the ID31 floor.
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
|
|
|
|
** Spindle Measurements
|
|
|
|
[[file:Spindle/index.org][Link to the analysis]]
|
|
|
|
|
|
|
|
*** Notes
|
|
|
|
| *Date* | 2017-04-25 |
|
|
|
|
| *Location* | PEL Lab |
|
|
|
|
|
|
|
|
*** Goal
|
|
|
|
The goal is to estimate all the error motions induced by the Spindle
|
|
|
|
|
|
|
|
*** Results
|
|
|
|
|
|
|
|
* Ressources
|
|
|
|
[[file:actuators-sensors/index.org][Actuators and Sensors]]
|
2019-05-10 09:13:09 +02:00
|
|
|
|
|
|
|
* Other measurements
|
2019-04-17 18:20:17 +02:00
|
|
|
- [[file:huddle-test-geophones/index.org][Huddle Test - Geophones]]
|
2019-05-02 14:12:11 +02:00
|
|
|
- [[file:disturbance-measurement/index.org][Disturbance Measurement]]
|
|
|
|
- [[file:slip-ring-test/index.org][Slip Ring - Noise measurement]]
|
|
|
|
- [[file:static-measurements/index.org][Control System Measurement]]
|
2019-05-02 15:17:46 +02:00
|
|
|
- [[file:equipment/equipment.org][Equipment used for the measurements]]
|